Sunday, 26 December 2010
Wednesday, 8 December 2010
8th December
The Deaf Loop is installed and functioning.
The cupboards are now completed, with knobs and locks.
The hand basin is installed in the Toilet area.
The The Brand New Cooker (donated by a very generous village family) is awaiting installation.
The new door into the kitchen has been painted.
The stainless steel kitchen units are about to be installed.
The hand basin is installed in the Toilet area.
The The Brand New Cooker (donated by a very generous village family) is awaiting installation.
The new door into the kitchen has been painted.
The stainless steel kitchen units are about to be installed.